FUSIONCOST AI QUOTATION REPORT
Professional Bill of Quantities
SECTION A — SUMMARY
Cost breakdown by trade category
Trade Category
Subtotal (SGD)
% of Total
General Works
S$2,076.00
9%
Masonry & Wet Works
S$2,548.40
11%
Carpentry & Joinery
S$18,540.00
80%
TOTAL ESTIMATED RENOVATION COSTS$23,164.40
SECTION B — ITEMISED BREAKDOWN
Detailed cost breakdown by trade category
General Works
S$2,076.00Description
Unit
Qty
Rate
Amount
Site protection & cleaning
lot
1
1620.00
S$1,620.00
Daily cleaning, protective sheeting, and site protection
Disposal & transportation
trip
1
456.00
S$456.00
Per lorry trip with loading
Subtotal (General Works):S$2,076.00
Masonry & Wet Works
S$2,548.40Description
Unit
Qty
Rate
Amount
Wall tiling (300×600 mm tiles)
m²
2
162.00
S$324.00
Including mid-range ceramic tiles and installation
Floor tiling (600×600 mm tiles)
m²
8.3
138.00
S$1,145.40
Including mid-range porcelain tiles and installation
Waterproofing
m²
8.3
84.00
S$697.20
3-coat waterproofing membrane system with guarantee
Cement screeding
m²
8.3
46.00
S$381.80
25-30mm thick self-leveling screed
Subtotal (Masonry & Wet Works):S$2,548.40
Carpentry & Joinery
S$18,540.00Description
Unit
Qty
Rate
Amount
Drawer system with soft-close
No.
3
264.00
S$792.00
Full extension ball-bearing slides
Kitchen cabinet (base) - complete
ft
18
456.00
S$8,208.00
Including carcass, doors, drawers, hardware
Kitchen cabinet (wall) - complete
ft
8
384.00
S$3,072.00
Including carcass, doors, hardware
Kitchen countertop (quartz)
ft
18
336.00
S$6,048.00
20mm engineered quartz with polished edge
Cabinet hardware (handles/knobs)
No.
14
30.00
S$420.00
Mid-range stainless steel or aluminum
Subtotal (Carpentry & Joinery):S$18,540.00
SECTION C — SUMMARY & TOTAL
Final cost calculation
Subtotal (All Trades)S$23,164.40
Total Estimated CostS$23,164.40